We were asked to make a canopy for a fire in a local public house. We went along to measure up and also to do a smoke test to make sure there was enough pull on the chimney. The pub had a gas fire before, so we organised for a gas safe engineer to come along to disconnect the fire. We went back to the workshop to start making the canopy. We designed the canopy on a computer, then transferred it to our CNC plasma cutter to profile the parts. We bent the parts and welded it together, then riveted … [Read more...]
Monthly Archives: March 2013
Archives for March 2013
Canopy
March 12, 2013 by Rob
Filed Under: Installations, Sheet Metal Work Tagged With: installations, portfolio, sheet metal work
AGA Wenlock stove
March 7, 2013 by Rob
After doing a survey on this job we recommended fitting a 904 stainless steel liner. The client accepted our quote so we proceeded. We noticed that the stove would be a tight fit in the opening, so we decided to make a offset pipe to connect the stove to the stainless steel liner. We made the offset pipe and the register plate at our workshop, using our CNC plasma machine to cut out the pipe. Next we rolled the metal into a pipe and welded the three bits of pipe together. Once the liner was … [Read more...]
Filed Under: Installations, Portfolio, Sheet Metal Work Tagged With: installations, portfolio, sheet metal work