AGA Wenlock stove

After doing a survey on this job we recommended fitting a 904 stainless steel liner. The client accepted our quote so we proceeded. We noticed that the stove would be a tight fit in the opening, so we decided to make a offset pipe to connect the stove to the stainless steel liner. We made the offset pipe and the register plate at our workshop, using our CNC plasma machine to cut out the pipe. Next we rolled the metal into a pipe and welded the three bits of pipe together. Once the liner was delivered to site we installed the liner into the chimney. Next we installed the register plate, then put the stove into position. Next we installed our manufactured pipe to the stove and connected it to the liner. Once this has being connected properly we back filled the chimney with vermiculate and put on a new chimney pot. Job done.